Uncategorized

Woody Waste to Re-Open Saturday

Woody Waste cards need renewed annually. To renew or purchase a card, come to the Borough offices 8:30 am to 4:30 pm Monday thru Friday. Residents $10.00; Lower Swatara $50.00. Contractors are NOT permitted to dump. The Woody Waste site re-opens March 7, 2026 and is open Monday, Wednesday, Friday, Saturday and Sunday from 8:00 am to 7:00 pm. Mulch can be obtained at Susquehanna… Read More

Road Closure – N Union Street (March 16-May 22)

Veolia’s contractor, Wexcon, will be doing road work on North Union Street March 16 through May 22. North Union Street will be closed from Spring Street to Main Street. Detour signs will be in place. Contact Veolia at 888-844-0352 for more information.

Road Work – Main Street – March 9 and March 10, 2026

PennDOT will be doing road work Monday, March 9 and Tuesday, March 10 on Main Street from 7 a.m. until 4 pm. There will be No Parking on both sides of Main Street between Nissley Street and Spruce Street. Schedule based on weather conditions.

FREE MULCH AND LEAF COMPOST

Free mulch and leaf compost are available on Susquehanna Street in the parking lot near the football field.    

PennDOT Conducting Traffic Counts (March-November 2026)

PennDOT’s contractor, National Data & Surveying Services, will be collecting traffic data on the following roads within the Borough: Keystone Avenue between Wood and Catherine Maple Rd. 320 Feet East of Deatrich Ave. Spruce St. between Emaus and Raymond N. Union St between Girard and Locust This will enable PennDOT to update their data to help decisions on safety, design and operation of roadways.

Road Work – Oak Hills/Spruce Street

The Electric Department will be replacing damaged underground streetlight conduit at the intersection of Oak Hills Drive and Spruce Street February 25-26, 2026 (weather permitting). Some streetlights in the area may be affected overnight. Detours will be in place. Thank you for your patience.

Snow Emergency Lifted

Mayor Lloyd has lifted the snow emergency effective immediately.

Road Work – Main Street – March 2 and March 3, 2026

PennDOT will be doing road work Monday, March 2 and Tuesday, March 3 on Main Street from 7 a.m. until 4 pm. There will be No Parking on both sides of Main Street between Nissley Street and Spruce Street. Schedule based on weather conditions.